Arroyo Verdugo
Subregion Projects: Arroyo Verdugo
10. Orange Line BRT Connector to Gold Line Rail
15.3-mile bus rapid transit line from North Hollywood Orange/Red Line Rail Station to the Gold Line Rail in Pasadena. The project could be converted to a rail service at a later date if ridership demand outgrows the bus rapid service capacity.
33. Regional Commuter Rail (Metrolink and Amtrak) Improvements
Various capital improvements to enhance travel times, service reliability and speed on Metrolink and Amtrak.
* Not shown on map
LA River Bike Path Extension: Canoga Park to Glendale
Constructs a 12-mile bike path along the LA River connecting Canoga Park to Glendale. The project will complete the LA River Bike Path between Downtown Los Angeles and the San Fernando Valley.
Arroyo Verdugo Transportation Improvements
Various local street improvements to eliminate bottlenecks and improve traffic flow to/from adjacent freeways/major highways and connections to local communities.
Local Return Allocations by Subregion: Arroyo Verdugo
City | Prop A (25%) | Prop C (20%) | MR (15%) | MM (17%) |
---|---|---|---|---|
Burbank | 2,137,575 | 1,773,062 | 1,329,797 | 1,507,103 |
Glendale | 4,013,485 | 3,329,080 | 2,496,810 | 2,829,718 |
La Canada Flintridge | 414,925 | 344,170 | 258,127 | 292,544 |
LA County UA | 215,646 | 178,873 | 134,154 | 152,042 |
Pasadena | 2,851,403 | 2,365,164 | 1,773,873 | 2,010,389 |
South Pasadena | 527,402 | 437,466 | 328,099 | 371,846 |
Total | $10,160,436 | 8,427,814 | 6,320,861 | 7,163,642 |