Subregion Projects: Arroyo Verdugo

10. Orange Line BRT Connector to Gold Line Rail

15.3-mile bus rapid transit line from North Hollywood Orange/Red Line Rail Station to the Gold Line Rail in Pasadena. The project could be converted to a rail service at a later date if ridership demand outgrows the bus rapid service capacity.

33. Regional Commuter Rail (Metrolink and Amtrak) Improvements

Various capital improvements to enhance travel times, service reliability and speed on Metrolink and Amtrak.

* Not shown on map

LA River Bike Path Extension: Canoga Park to Glendale

Constructs a 12-mile bike path along the LA River connecting Canoga Park to Glendale. The project will complete the LA River Bike Path between Downtown Los Angeles and the San Fernando Valley.

Arroyo Verdugo Transportation Improvements

Various local street improvements to eliminate bottlenecks and improve traffic flow to/from adjacent freeways/major highways and connections to local communities.

Local Return Allocations by Subregion: Arroyo Verdugo

City Prop A (25%) Prop C (20%) MR (15%) MM (17%)
Burbank2,137,575 1,773,062 1,329,7971,507,103
Glendale4,013,485 3,329,0802,496,8102,829,718
La Canada Flintridge 414,925 344,170 258,127292,544
LA County UA 215,646178,873 134,154 152,042
Pasadena 2,851,4032,365,1641,773,8732,010,389
South Pasadena527,402437,466328,099371,846
Total$10,160,436 8,427,8146,320,8617,163,642