Central Los Angeles

Subregion Projects: Central Los Angeles

23. Vermont BRT Corridor: Hollywood Bl to 120th St

Adds a 12.5-mile high capacity bus rapid transit corridor from Hollywood Bl to 120th St. The project could be converted to a rail service at a later date if ridership demand outgrows the bus rapid service capacity.

25. West Santa Ana Transit Corridor Segment 2

New light rail connection from the City of Artesia to Union Station spanning 20 miles using city streets, Metro, and ports-owned rail right-of-way.

27. Crenshaw Line Rail Northern Extension to West Hollywood

Extends Crenshaw Line Rail north from the Expo/Crenshaw Station to Hollywood at the Red Line Rail Hollywood/Highland Station.

33. Regional Commuter Rail (Metrolink and Amtrak) Improvements

Various capital improvements to enhance travel times, service reliability and speed on Metrolink and Amtrak.

* Not shown on map

LA River Waterway and Bike Path: Elysian Valley to Maywood

Constructs eight-mile bike path along the LA River connecting the Elysian Valley to the City of Maywood through downtown Los Angeles. The measure will complete the LA River Bike Path between Long Beach and the Sepulveda Basin in the San Fernando Valley.

Historic Downtown Streetcar

Builds a 3.8-mile streetcar along existing traffic lanes from 1st St to 11th St in downtown Los Angeles.

Local Return Allocations by Subregion: Central Los Angeles

CityProp A (25%) Prop C (20%)MR (15%)MM (17%)
LA County UA11,862,5019,839,6327,379,7248,363,687
Los Angeles City27,639,95322,926,61417,194,96019,487,622
Total 39,502,45432,766,24624,574,68527,851,309